Assessment of construction impact on surrounding buildings

We assess how the excavation pit, foundation works and dewatering will affect neighbouring buildings, structures and utilities. The building survey provides the baseline data, while the analysis delivers predictions of additional deformations and conclusions for the designer.

  • SP 22.13330 impact assessment
  • analysis of deformations
  • building survey of neighbouring buildings

From the condition of neighbouring buildings to predicting construction impact

excavationzone of influencebuilding 1building 2building 3
Excavation and neighbouring buildingsHover over the plan— we will identify the structures within the zone of influence

What is a construction impact assessment

A construction impact assessment predicts how proposed works will alter the condition of the ground and foundations of surrounding buildings. Designers need it to verify their design solutions and determine whether neighbouring structures require protection.

A building survey of the surrounding development is part of this task: it records the condition of buildings before works begin. Simply logging cracks and installing tell-tales does not replace the calculation of additional deformations. Geotechnical monitoring checks actual changes during construction and is carried out under a separate programme.

Interesting factBuilding surveys

Reinforcement can be located without opening the concrete

Ground-penetrating radar sends electromagnetic pulses into concrete and records reflections. These can reveal reinforcement positions and help estimate concrete cover. Results depend on the structure and measurement conditions.

Source: FHWA

A hidden problem can leave a thermal trace

A thermal camera measures surface temperature. A concealed pipe or moisture can change the temperature of a wall and appear in the image. The camera cannot directly see through the wall.

Source: FLIR

Rust can crack concrete from the inside

Reinforcement corrosion products occupy more volume than the original metal. They create internal pressure that can crack and spall concrete. Visible damage may begin with a process hidden inside the structure for a long time.

Source: FHWA

Every crack has a movement history

A building survey needs to establish whether a crack is still opening or movement has stopped. Repeated measurements and monitoring provide that evidence. A single photograph cannot show the structure’s movement history.

Source: Historic England

How we carry out a construction impact assessment

We determine the scope and schedule based on the design, geotechnical conditions and the state of the surrounding buildings.

1in accordance with the work programme

Baseline data and preliminary zone of influence

in accordance with the work programme

We review the geotechnical surveys, the design for the excavation pit, foundations and underground structure, the construction sequence, and dewatering. We outline the potential zone of influence and list the neighbouring buildings, structures and utilities to be assessed.

Stage outcome: work programme and schedule of surrounding structures.

Excavation zone of influence
diagram: cross-section
excavationH — depthzone of influence boundarywithin the zone — to be surveyedoutside the zonewithin the zonethe zone of influence radius is determined under SP 22.13330 — depending on excavation depth, retaining wall system and ground conditions
CIA-ZI
2depending on the number and accessibility of structures

Adjacent building survey

depending on the number and accessibility of structures

We compile data on the structural systems and foundations of neighbouring buildings. We inspect accessible structural elements, record defects and assign a technical condition category. The scope of instrumental testing, trial pits and tell-tale installation is defined by the survey programme.

Stage outcome: baseline technical condition of buildings for the impact analysis.

What is required for the assessment
baseline data
  • Geotechnical survey report
  • Excavation pit, retaining wall and foundation design
  • Construction sequence and dewatering
  • Information on neighbouring buildings and utilities
  • Results of the surrounding building survey
CIA-D
3depending on the complexity of the numerical model

Construction impact analysis

depending on the complexity of the numerical model

We evaluate additional settlements and differential deformations of surrounding buildings caused by the proposed works. We account for soil conditions, structural systems, the technical condition of neighbouring structures and construction stages. We compare calculated deformations against permissible limits and refine the zone of influence.

Stage outcome: geotechnical prediction and conclusions on the impact of the adopted design solutions.

What the analysis checks
geotechnical prediction
SectionContents
Impactsexcavation pit, foundations, dewatering
Developmentbuildings, structures, utilities
Deformationsadditional settlements and differential movement
Verificationcomparison against permissible limits
CIA-A
4based on the analysis results

Conclusions and recommendations

based on the analysis results

We demonstrate whether the calculated impact on neighbouring structures is within acceptable limits. Where protective measures or adjustments to construction methods are required, we state this clearly. We also provide recommendations for geotechnical monitoring; the detailed design of protective measures and on-site monitoring are agreed separately.

Stage outcome: construction impact assessment report complete with calculations and recommendations.

What the designer receives
assessment results
SectionContents
Zone of influencelist of affected structures
Deformationsprediction and permissible limits
Conclusionsimpact of design solutions
Recommendationsprotection and monitoring
CIA-Z
5timescale — depending on the scope of work

Construction impact assessment report

timescale — depending on the scope of work

In the report, we link the baseline condition of surrounding buildings to the calculated impact of the proposed works:

  • Baseline data — geotechnical conditions, design solutions and building survey results
  • Analytical section — adopted assumptions, construction stages, zone of influence and additional deformations
  • Conclusions — comparison against permissible limits, recommendations for protection and geotechnical monitoring

Deliverables: digital report containing calculations and recommendations.

Building survey — baseline data for the assessment
schematic example of defect recording
M1M2M3cracks (in red) and tell-tales M1–M3 with installation dates — for each elevation
CIA-F
6separate scope of work

Monitoring during construction

separate scope of work

Monitoring complements the impact assessment: the calculation predicts changes, whereas observations record actual settlements, tilts and crack widths. The scope of observations, frequency and threshold values are defined in the geotechnical monitoring programme.

What is monitored
in accordance with the monitoring programme
  • Building settlements and tilts
  • Crack opening
  • Appearance of new defects
  • Comparison with the baseline condition
  • Comparison against permissible limits
CIA-M

Our track record in building surveys

Examples of building surveys—one of the stages of an impact assessment. The figures shown are the costs of the building surveys for these projects, not the price of a full construction impact assessment.

These are just some of our projects — we carry out work on 40–50 sites every year.

How much does a construction impact assessment cost?

We calculate the cost after reviewing the design and baseline data. The building survey, impact analysis and any additional works are itemised separately.

CostAs specified in the brief
  • Durationdepending on the scope of work
  • Monitoringquoted separately

To get a quote, please send:

  • Site location plan and data on neighbouring structures
  • Excavation pit, retaining wall and foundation design
  • Geotechnical surveys
  • Available building survey records
Get an estimate
  • What determines the price
  • Surrounding buildingsnumber of structures, their structural system and condition
  • Design solutionsexcavation depth, retaining structure, foundations and work stages
  • Soils and groundwatercomplexity of the analysis and impact of dewatering
  • Baseline datacompleteness of surveys, building inspections and design documentation
  • Additional worksprotective measures and monitoring — as specified in the brief

Questions about construction impact assessment

How does an impact assessment differ from a building survey of surrounding structures?

A building survey determines the actual structural condition of neighbouring buildings. The impact assessment uses these data alongside numerical analysis to predict additional construction-induced deformations and compare them against permissible limits.

Which standards govern the impact assessment?

SP 22.13330 "Foundations of Buildings and Structures" is used for impact assessment, GOST 31937-2024 for building surveys, and SP 305.1325800 for geotechnical monitoring. Additional requirements are selected depending on the facility type and proposed works.

When is a construction impact assessment carried out?

At the design preparation stage, prior to commencing any works that could affect surrounding buildings. An assessment is also required during reconstruction if the works may induce additional deformations in neighbouring structures.

How is the zone of influence determined?

A preliminary zone is defined based on baseline data and applicable regulations. It is then refined by calculation, taking into account the soils, excavation pit, foundations, construction methods and neighbouring structures. There is no single universal distance that applies to every site.

Is monitoring included in the impact assessment?

Monitoring recommendations are included in the assessment conclusions. Preparing the monitoring programme and carrying out observations during construction are separate services; their scope and cost are itemised in our quotation.

What if there is no access to a neighbouring building?

We record any access restrictions and inspect the accessible structural elements. We then evaluate whether the collected data are sufficient for the analysis. If not, we agree on obtaining additional information or access; we never pass off a restricted inspection as a full building survey.

Send us your project — we will calculate the cost of the impact assessment

If you do not have a technical brief, describe the project: site location, planned construction, and whether a design exists. We will reply with a scope of work and cost.