All four survey disciplines under a single contract and a unified set of reports for expert review.
A brief introduction to building surveys and a guide to the right service.
Describe your site and objective — we will advise which documents you need.
All four survey disciplines under a single contract and a unified set of reports for expert review.
A brief introduction to building surveys and a guide to the right service.
Describe your site and objective — we will advise which documents you need.
We tell you what and how much can be built on a plot before you buy or commission a design: permitted land use, maximum parameters, restrictions and protection zones, buildable footprint, and achievable floor area.
Before buying the plot — not after
Urban planning analysis of a land plot — is a feasibility check of what can be built on a specific plot. We bring together EGRN records, Land Use and Development Rules (PZZ), the General Plan, territory planning projects, and protection and sanitary zones to provide a clear answer: what type of facility is permitted, what floor area is allowed and where on the plot it may be sited.
A plot feasibility study is commissioned before purchasing land, before commissioning a design, and prior to obtaining the GPZU. It protects against a costly mistake — buying land where your planned project cannot be built, or can only be built at half the intended scale.
Interesting factUrban planning
In the Eixample district, block corners are chamfered at 45°. This creates more spacious intersections and makes movement easier for pedestrians and traffic.
Source: Turisme de Barcelona
The Boulevard Ring took the place of the demolished walls and towers of the White City. The fortifications are gone, but their alignment still shapes the layout of Moscow.
Source: Museum of Moscow
Roads and buildings store heat during the day and gradually release it after sunset. Cities can therefore stay warmer than surrounding areas at night. Vegetation, materials and the arrangement of buildings influence this effect.
Source: US EPA
Population density depends on a combination of building height, residential coverage and floor space occupancy: the number of people per unit of floor area. Cities achieve high density in different ways; height alone does not explain it.
Source: UN-Habitat
The core of Brazil’s new capital, Brasília, was built in 1956–1960. Housing districts, the administrative centre, roads and open spaces followed a shared urban plan. The ensemble is listed as UNESCO World Heritage.
Source: UNESCO
Each step represents a separate layer of constraints. Together, they answer what can be built.
Using the cadastral number, we obtain Unified State Register of Real Estate (EGRN) records: boundaries, area, land category, permitted use and encumbrances. We check what already stands on the plot and nearby.
Stage outcome: accurate baseline data on the site.
We identify the territorial zone under the Land Use and Development Rules (PZZ) and the functional zone under the General Plan. We extract the maximum permitted parameters: setbacks, site coverage and plot ratio, number of storeys or height, and minimum plot size.
Stage outcome: what is permitted to be built and with what parameters.
| Parameter | Value |
|---|---|
| Minimum boundary setback | 3 m |
| Maximum site coverage | by zone |
| Maximum storeys or height | by zone |
| Permitted land uses | primary, conditionally permitted, ancillary |
We check zones with special conditions for use of territory (ZOUIT): utility protection corridors, water protection and sanitary protection zones, aerodrome safeguarding zones, cultural heritage zones, red lines and area planning projects. Every constraint is plotted on the drawing.
Stage outcome: site constraints map.
By combining all constraints, we define the buildable zone and calculate the maximum building footprint and gross floor area. If needed, we also test-fit a specific facility — such as a warehouse, residential building or retail unit.
Stage outcome: how much can be built on the plot.
| Parameter | Unit |
|---|---|
| Plot area | m² |
| Buildable footprint zone | m² |
| Building footprint | m² |
| Number of storeys | fl. |
| Gross internal area | m² |
The deliverable is a concise report in plain language and a site diagram — ready to present to an investor, bank, or architect.
Deliverables: assessment report and site layout plan in electronic format.
We will give you an exact price once we have seen the cadastral number and the scope of work.
To get a quote, please send:
A GPZU (urban development plan of the land plot) is an official document issued by authorised bodies upon application by the titleholder. Our pre-development assessment analyses the same data plus additional sources; it can be completed quickly and prior to purchasing the plot, when obtaining an official GPZU is not yet possible.
The titleholder submits an application to the local authority where the plot is located: electronically with a digital signature, via an MFC service centre, or through the Gosuslugi portal. The GPZU is prepared and issued free of charge within 14 working days (Town Planning Code of the Russian Federation, Art. 57.3). The document lists permitted uses, development limits and restrictions, but does not show what specific building or floor area will actually fit on the plot — that is determined by an urban planning feasibility study.
Why it helps: it shows whether you can build a house on the plot, what setbacks apply, and whether utility protection zones or other restrictions prohibit construction or require complex approvals.
We will advise on the options — changing the permitted land use, obtaining a permit for deviation from maximum permitted parameters (DPD), or merging plots — and assess whether it is feasible.
Yes, Unified State Register of Real Estate (EGRN) data and land use regulations are available across Russia. Lead times may be longer if regional documents have not been published.
If you do not have a technical brief, describe the project: site location, planned construction, and whether a design exists. We will reply with a scope of work and cost.