GPZU

Urban planning assessment of the site

We tell you what and how much can be built on a plot before you buy or commission a design: permitted land use, maximum parameters, restrictions and protection zones, buildable footprint, and achievable floor area.

  • from 15,000 ₽
  • 3–5 working days
  • Moscow and Moscow Region

Before buying the plot — not after

streetEGRN boundarybuilding line (red line)gas pipeline protection zone3 m setbackpotential building footprint
Layer-by-layer plot analysisHover over a layer— we will show what we check

What an urban planning feasibility study is

Urban planning analysis of a land plot — is a feasibility check of what can be built on a specific plot. We bring together EGRN records, Land Use and Development Rules (PZZ), the General Plan, territory planning projects, and protection and sanitary zones to provide a clear answer: what type of facility is permitted, what floor area is allowed and where on the plot it may be sited.

A plot feasibility study is commissioned before purchasing land, before commissioning a design, and prior to obtaining the GPZU. It protects against a costly mistake — buying land where your planned project cannot be built, or can only be built at half the intended scale.

Interesting factUrban planning

Barcelona’s city blocks have cut-off corners

In the Eixample district, block corners are chamfered at 45°. This creates more spacious intersections and makes movement easier for pedestrians and traffic.

Source: Turisme de Barcelona

Moscow’s boulevards trace a vanished fortress

The Boulevard Ring took the place of the demolished walls and towers of the White City. The fortifications are gone, but their alignment still shapes the layout of Moscow.

Source: Museum of Moscow

Cities release stored solar heat at night

Roads and buildings store heat during the day and gradually release it after sunset. Cities can therefore stay warmer than surrounding areas at night. Vegetation, materials and the arrangement of buildings influence this effect.

Source: US EPA

A densely populated city need not have skyscrapers

Population density depends on a combination of building height, residential coverage and floor space occupancy: the number of people per unit of floor area. Cities achieve high density in different ways; height alone does not explain it.

Source: UN-Habitat

A capital conceived as one composition

The core of Brazil’s new capital, Brasília, was built in 1956–1960. Housing districts, the administrative centre, roads and open spaces followed a shared urban plan. The ensemble is listed as UNESCO World Heritage.

Source: UNESCO

What we check during an urban planning analysis of a plot

Each step represents a separate layer of constraints. Together, they answer what can be built.

11 day

Site details

1 day

Using the cadastral number, we obtain Unified State Register of Real Estate (EGRN) records: boundaries, area, land category, permitted use and encumbrances. We check what already stands on the plot and nearby.

Stage outcome: accurate baseline data on the site.

What we check in the EGRN
baseline data
  • Boundaries and area
  • Land category
  • Permitted land use
  • Encumbrances andfreezing orders
  • Buildings and structures on the site
GPZU-1
21 day

Land use regulations and masterplan

1 day

We identify the territorial zone under the Land Use and Development Rules (PZZ) and the functional zone under the General Plan. We extract the maximum permitted parameters: setbacks, site coverage and plot ratio, number of storeys or height, and minimum plot size.

Stage outcome: what is permitted to be built and with what parameters.

Permitted development limits
sample Land Use and Development Rules (PZZ) extract
ParameterValue
Minimum boundary setback3 m
Maximum site coverageby zone
Maximum storeys or heightby zone
Permitted land usesprimary, conditionally permitted, ancillary
GPZU-2
31–2 days

Restrictions and encumbrances

1–2 days

We check zones with special conditions for use of territory (ZOUIT): utility protection corridors, water protection and sanitary protection zones, aerodrome safeguarding zones, cultural heritage zones, red lines and area planning projects. Every constraint is plotted on the drawing.

Stage outcome: site constraints map.

What constraints we check for
Restricted use zones (ZOUIT) and planning
  • Protection zones for power lines, gas pipelines and district heating mains
  • Water protection zones and riparian buffer strips
  • Industrial sanitary protection zones
  • Aerodrome safeguarding zones
  • Cultural heritage sites and their zones
  • Building lines (red lines) and territory planning projects
GPZU-3
41–2 days

Building footprint and technical and economic indicators

1–2 days

By combining all constraints, we define the buildable zone and calculate the maximum building footprint and gross floor area. If needed, we also test-fit a specific facility — such as a warehouse, residential building or retail unit.

Stage outcome: how much can be built on the plot.

Key project indicators
what we calculate
ParameterUnit
Plot aream²
Buildable footprint zonem²
Building footprintm²
Number of storeysfl.
Gross internal aream²
GPZU-4
5total 3–5 working days

Urban development feasibility report for the land plot

total 3–5 working days

The deliverable is a concise report in plain language and a site diagram — ready to present to an investor, bank, or architect.

Deliverables: assessment report and site layout plan in electronic format.

Site assessment conclusion
what you will receive
  • What is permitted to be built and with what parameters
  • Layout showing boundaries, setbacks and restrictions
  • Potential building footprint and floor area
  • Risks: encumbrances, restriction zones, building lines
  • What to do next: GPZU, surveys, design
GPZU

How much does a site feasibility assessment cost

We will give you an exact price once we have seen the cadastral number and the scope of work.

Costfrom 15,000 ₽
  • Duration3–5 working days
  • Building footprint placementon request

To get a quote, please send:

  • Plot cadastral number
  • What you want to build
  • Timeline for a decision on the plot
Get an estimate
  • What determines the price
  • Number of plotsa single plot or several adjacent plots
  • Restrictionshow many zones and encumbrances need to be checked
  • Building footprint placementwhether a specific building needs to be sited
  • RegionMoscow, Moscow Region or another region

Questions about urban planning feasibility studies

How does a planning appraisal differ from a GPZU?

A GPZU (urban development plan of the land plot) is an official document issued by authorised bodies upon application by the titleholder. Our pre-development assessment analyses the same data plus additional sources; it can be completed quickly and prior to purchasing the plot, when obtaining an official GPZU is not yet possible.

How to obtain a GPZU?

The titleholder submits an application to the local authority where the plot is located: electronically with a digital signature, via an MFC service centre, or through the Gosuslugi portal. The GPZU is prepared and issued free of charge within 14 working days (Town Planning Code of the Russian Federation, Art. 57.3). The document lists permitted uses, development limits and restrictions, but does not show what specific building or floor area will actually fit on the plot — that is determined by an urban planning feasibility study.

Is a pre-development assessment needed for a private house?

Why it helps: it shows whether you can build a house on the plot, what setbacks apply, and whether utility protection zones or other restrictions prohibit construction or require complex approvals.

What if the plot is not suitable for your plans?

We will advise on the options — changing the permitted land use, obtaining a permit for deviation from maximum permitted parameters (DPD), or merging plots — and assess whether it is feasible.

Do you work outside Moscow and the Region?

Yes, Unified State Register of Real Estate (EGRN) data and land use regulations are available across Russia. Lead times may be longer if regional documents have not been published.

Send the cadastral number — we will tell you what can be built

If you do not have a technical brief, describe the project: site location, planned construction, and whether a design exists. We will reply with a scope of work and cost.