Modular boiler house, Moskovsky (New Moscow)

Topographic, geotechnical, environmental and hydrometeorological surveys for the construction of a 1.0 MW modular hot-water boiler house with two chimneys at an operating industrial site.

Cost of a similar project at today's rates520 000 ₽
Contract duration, calendar days35
Building9 × 3.2 m boiler house, 12 m chimneys
Drilling2 BHs × 12 m
The boiler-house site in the industrial yard, next to the production building.
The boiler-house site in the industrial yard, next to the production building.
Location map: Moscow, Moskovsky, land plot 77:17:0110205:24080
Moscow, Moskovsky, land plot 77:17:0110205:24080Approximate site location near Solnechnaya StreetOpen in Yandex Maps ↗

Objective

We completed topographic, geotechnical, environmental and hydrometeorological surveys for the design of a 1.0 MW packaged modular hot-water boiler house (BMK) in the town of Moskovsky, Novomoskovsky Administrative Okrug. The client is a manufacturing enterprise; the works were carried out in June–July 2026 under two contracts covering four types of surveys.

The 9.0 × 3.24 m boiler house, 4 m high, is founded on a raft foundation at a depth of 0.25 m, while two 12 m chimneys rest on a shared raft at a depth of 2 m. The site is a paved yard of an operating facility right next to an existing building wall, with live utilities and vehicle traffic, so work was carried out in restricted access conditions.

Two 12 m boreholes were drilled using a PBU-2 rig by cable-tool percussion drilling at 127 mm diameter with undisturbed block/tube sampling; the topographic survey was carried out by total station from Moscow geodetic control network stations with utility tracing, and the deliverables were uploaded to the Moscow GIS OGD via Mosgorgeotrest.

First page of the technical brief for engineering surveys for a packaged modular boiler house

Scope of work and deliverables

GTGeotechnical surveys

Scope of work

  • 2 boreholes 12 m deep — 24 linear metres of 127 mm cable-tool percussion drilling
  • sampling of 10 undisturbed cohesive soil cores and 3 soil samples for corrosivity testing
  • laboratory testing: physical properties on 10 samples, 6 direct shear tests and 6 oedometer consolidation tests, chemical analysis of aqueous extract
  • site reconnaissance survey and collection of archival materials

Results

  1. Geotechnical conditions — complexity category II (medium); level site on a moraine plain with an elevation of 178.5 m.
  2. From the surface is 1.2–1.3 m of consolidated fill (clay loam with crushed stone and construction debris), underlain down to 12 m by uniform stiff fluvioglacial clay loam with fine sand interbeds (EGU-2, deformation modulus 23 MPa) — the bearing stratum for the raft foundations.
  3. There is no continuous aquifer down to 12 m; during heavy rain and snowmelt, perched groundwater may occur in the fill and sand interlayers.
  4. Made ground is not recommended as a foundation bearing stratum and requires replacement or ground improvement; the soils are non-aggressive to concrete and reinforcement, and moderately aggressive to carbon steel.
  5. Standard frost penetration depth is 1.03 m for loams and 1.29 m for fill; the soils are moderately frost-susceptible and karst sinkholes are ruled out.
Geotechnical cross-section along line 1–1 between the boreholes beneath the boiler house and chimneys: fill overlying uniform glaciofluvial clay loams
Geotechnical cross-section along line 1–1 between the boreholes beneath the boiler house and chimneys: fill overlying uniform glaciofluvial clay loams
  • Embankment / Fill Made ground: brown stiff loam, reworked with sand, with inclusions of crushed stone and construction debris (tQIV)
  • EGU-2 Greyish-brown sandy clay, stiff, with interbeds of fine sand, with inclusions of grus and gravel up to 10%, fluvioglacial and glaciolacustrine (f,lgQIIms)
  • Groundwater level
Factual material map: two boreholes by the boiler house footprint and flue stacks

Legend

  • geotechnical borehole, number and depth, m
  • geotechnical cross-section line, number
  • footprints of the proposed boiler house and chimneys
Geotechnical surveys — about the service →

TSTopographic surveys

Scope of work

  • 1:500 engineering topographic plan for a 0.94 ha plot — industrial building, yard and open areas, contour interval — 0.5 m
  • horizontal and vertical survey control network tied to Moscow geodetic control points, measurements with a Sokkia electronic total station
  • survey and plotting of underground and above-ground utilities at the facility, statutory sign-off with utility operators
  • registration of deliverables in the Moscow GIS OGD system (Mosgorgeotrest acceptance record)

Results

  1. The site is levelled, with elevations of 177.9–179.1 m; on-site plant utilities and municipal utilities running alongside the plot are plotted on the plan.
  2. The survey records were registered with Moscow GIS OGD on 09.07.2026.
1:500 scale engineering topographic plan: industrial yard and utilities along the perimeter fence
1:500 scale engineering topographic plan: industrial yard and utilities along the perimeter fence
Mosgorgeotrest protocol on registration of materials in the Moscow GIS OGD (09.07.2026)
Mosgorgeotrest protocol on registration of materials in the Moscow GIS OGD (09.07.2026)
Topographic surveys — about the service →

ESEnvironmental surveys

Scope of work

  • 1 soil sample for chemical contamination and 1 for agrochemical analysis, gamma survey of 0.1 ha
  • gamma dose rate measurements at 10 points, noise, vibration and electromagnetic radiation measurements
  • walkover survey, enquiries to regulatory authorities, schematic environmental status map and map of zones with special conditions for land use

Results

  1. Topsoil and subsoil fall into the 'permissible' contamination category (total pollution index Zc = 8.5), with petroleum hydrocarbons and benzo(a)pyrene within limits; the natural topsoil layer down to 1 m is suitable for landscaping use.
  2. Gamma background is 0.11–0.18 µSv/h against a reference level of 0.6; background air concentrations do not exceed 0.44 MAC (maximum allowable concentration).
  3. There are no specially protected natural areas, cultural heritage sites or sanitary protection zones of hazardous facilities within a 1 km radius.
Schematic map of environmental conditions: sampling point and gamma survey on the boiler house site
Schematic map of environmental conditions: sampling point and gamma survey on the boiler house site
Map of zones with special conditions for use of territories around the site
Map of zones with special conditions for use of territories around the site
Environmental surveys — about the service →

HMHydrometeorological surveys

Scope of work

  • site climatic summary based on weather station data: temperatures, precipitation including calculation of the 1% exceedance daily maximum, wind, snow cover
  • characterisation of hazardous hydrometeorological phenomena in the area
  • reconnaissance survey and assessment of the impact of the nearest watercourse, water protection zones

Results

  1. A climatic characterisation was prepared: mean annual temperature 5.1 °C, absolute minimum −44 °C, 1% exceedance probability daily maximum precipitation 92 mm, snow cover depth up to 58 cm.
  2. The site lies above the high-water level of the nearest stream and outside its water protection zone and riparian buffer strip.
NNEInSESSWWNWJanuaryNNEInSESSWWNWJulyNNEInSESSWWNWYear
Wind rose for Podmoskovnaya weather station: directional frequency, % (January, July, annual); 5% rings
Hydrometeorological surveys — about the service →

Site photos

Boiler house site in the plant courtyard: machinery and materials right up against the building wall
Boiler house site in the plant courtyard: machinery and materials right up against the building wall

Result

The client received four technical reports for the boiler house design, and the topographic survey materials were registered in the Moscow GIS OGD. A positive non-state expert review conclusion was obtained.

This is just one of our projects: every year our specialists carry out surveys on 40–50 sites in Moscow, the Moscow Region, and across Russia.

Send your technical brief — we will price it the same day

If you do not have a technical brief, describe the project: site location, planned construction, and whether a design exists. We will reply with a scope of work and cost.