Road from Frunze Square to the Ladoga–Lunevo highway, Vladimir

Geodetic works as part of topographic surveys for the design of a new urban road featuring a railway overpass and bridges across the Rivers Rpen and Klyazma.

Cost of a similar project at today's rates2 750 000 ₽
Contract duration, calendar days35
Route3.5 km
Control network13 permanent and 4 temporary control points
Survey area boundaries: alignment of the future road from Frunze Square across the Rpen and Klyazma rivers to the Ladoga–Lunevo highway
Survey area boundaries: alignment of the future road from Frunze Square across the Rpen and Klyazma rivers to the Ladoga–Lunevo highway

Objective

We completed geodetic works as part of topographic surveys for the design documentation of a new road in Vladimir — from Frunze Square to the Ladoga–Lunevo road. The approximately 3.5 km road includes an overpass over a railway combined with a bridge across the River Rpen, and a bridge across the Klyazma; it is being built under the 'Safe High-Quality Roads' national project. The client is the lead survey contractor. The contract period is 35 calendar days.

We needed to establish a geodetic control network for subsequent use by the construction team and compile a complete record of utilities along the urban section of the route: underground services with chamber dips, overhead lines, railway cables and catenary system, overpass bridges and utility tunnels.

Fieldwork took place in the snow in December 2023. First, six state geodetic network monuments were inspected. Reference network monuments were installed by drilling: a 1.8 m metal pipe with a cement grout anchor below the frost line, a 2 × 2 m perimeter trench, fencing, and an identification plate. Coordinates were determined using dual-frequency GNSS receivers via static observations in MSK-33 and the Baltic Height System.

First page of the technical brief for topographic works for a highway in Vladimir

Scope of work and deliverables

TSTopographic surveys

Scope of work

  • geodetic control network along a 3.5 km route: 13 permanent markers and 4 temporary markers, MSK-33, Baltic Height System
  • inspection of 6 state geodetic network points, inventory schedule and inspection record cards
  • static satellite observations and network adjustment, calculation of transformation parameters from WGS-84 to MSK-33
  • survey of underground utilities with manhole opening and measurements, using a cable and pipe locator along cable and pipeline routes
  • survey of overhead power lines, communication lines and railway catenary with determination of wire and pole elevations

Results

  1. A survey control network was established for the surveys and subsequent construction: a station description sheet with a photo, marker drawing and coordinates was prepared for each point, and the stations were handed over to the client.
  2. Of the six surveyed state geodetic network benchmarks, the condition of each is recorded on a benchmark card, with any missing surface markers noted.
  3. A schedule of coordinates and elevations, network adjustment reports and transformation parameter calculation reports were prepared.
  4. Vector plans of underground and above-ground utilities at 1:500 scale were delivered for all route sections — from urban areas to the railway and the Klyazma River.
Reference description of a permanent survey control point: tie-in diagram, photograph and marker drawing
Reference description of a permanent survey control point: tie-in diagram, photograph and marker drawing
State geodetic network station inspection card
State geodetic network station inspection card
Topographic surveys — about the service →

Site photos

Installing a control network benchmark: borehole for a metal marker
Installing a control network benchmark: borehole for a metal marker
Long-term survey monument with trenching and fencing
Long-term survey monument with trenching and fencing
GNSS receiver on a state geodetic network station
GNSS receiver on a state geodetic network station
Static GNSS observations at a control network station
Static GNSS observations at a control network station
Opened underground utility chamber: depth measurements
Opened underground utility chamber: depth measurements
Railway overhead line stanchions at the route crossing
Railway overhead line stanchions at the route crossing

Result

The client received the geodetic control network benchmarks with a handover certificate, a coordinate catalogue, benchmark cards and location sketches, as well as survey sketches of underground and above-ground utilities. These materials were incorporated into the topographic survey technical report for the road design documentation.

This is just one of our projects: every year our specialists carry out surveys on 40–50 sites in Moscow, the Moscow Region, and across Russia.

Send your technical brief — we will price it the same day

If you do not have a technical brief, describe the project: site location, planned construction, and whether a design exists. We will reply with a scope of work and cost.